beautypg.com

Burnham ALP150 User Manual

Page 64

background image

6

Figure

: Modular W

iring Diagram w/T

ekmar 265 Control

Tekmar 265 Based Control System (or equal)

Sequence of Operation

The

Tekmar 265 Control (or equal) can control either 3 modulating boilers or 2 modulating boilers and an Indirect W

ater Heater

. When a call for heat is

received by the

Tekmar 265 Control, the control will fire either one or more boilers in either parallel or sequential firing mode to establish a required reset

water temperature in the system supply main based on outdoor temperature.

The boilers will modulate based on an

Analog communication signal established

between the

Tekmar 265 Control and each boiler

’s MCBA

Control.

This signal is established by means of a pair of wires from boiler terminal strip to 265

Control utilizing a 500 OHM ¼ watt resistor bridging the conductor connections (the resistors are installer provided and available at any electronic parts store like Radio Shack, etc.).

The boiler(s) and system supply water temperature will be reset together to maintain what is needed to the system. When a call for

Indirect Hot W

ater is generated to the

Tekmar 265, the control will de-energize the zone pump control (ZC terminal), energize the Indirect pump and modulate

the boiler firing to establish a setpoint temperature in the main for the Indirect Heater using Priority

.

The

Tekmar 265 also controls each boiler

’s pump and a

post purge of leftover temperature in the boilers will occur at the end of the call for Indirect Hot W

ater

.

This manual is related to the following products: