The direct vent termination location is restricted as
follows:

a. Minimum twelve (12) inches above grade plus

normally expected snow accumulation level, or
minimum seven (7) feet above grade, if direct
vent terminal is located adjacent to public

walkway. Do not install the terminal over public
walkway where local experience indicates that

appliance flue gas vapor or condensate creates a
nuisance or hazard.

b. Minimum three (3) feet above any forced air

inlet located within ten (10) feet.

c. Minimum four (4) feet horizontally from electric

meters, gas meters, regulators and relief valves.
This distance may be reduced if equipment is

protected from damage due to flue gas vapor or
condensation by enclosure, overhang, etc.

d. Minimum twelve (12) inches below, above or

horizontally from any air opening into a building
(window, door or gravity air inlet).

e. Minimum twelve (36) inches horizontally from a

building corner.

f. Minimum twelve (12) inches vertically from any

roof overhang twelve (12) inches or less wide.
If a roof overhang width exceeds twelve (12)
inches the terminal vertical clearance must be

increased to avoid flue vapor condensation.

8. Enclose vent passing through occupied or

unoccupied spaces above the boiler with material

having a fire resistance rating of at least equal to the

rating of the adjoining floor or ceiling. Maintain
minimum clearances to combustible materials. See
Figure 2.

Note: For one or two family dwellings, fire
resistance rating requirement may not need to be
met, but is recommended.

9. Plan venting system to avoid possible contact with

plumbing or electrical wires. Start at vent connector
on top of boiler and work towards vent terminal.

Concentric Venting - Horizontal Venting

1. Permitted terminals for horizontal venting:

Horizontal (Wall) Terminal, either 80/125 mm (P/N
101808-01) or 100/150 mm (P/N 101809-01) - see
Table 8.

2. Concentric Vent components supplied with the boiler

are packed inside boiler carton and include the
following:

a. 80/125 mm Horizontal (Wall) Terminal, Part

Number 101808-01

Horizontal (Wall) Terminal consists of
Straight section having plain male end with
locking band clamp installed; Terminal
Assembly with offset vent termination,
and Outside Wall Plate, both riveted
on the opposite end; overall length is
approximately 28-1/8”.

Separate Inside Wall Plate

Two Hardware Bags (each bag contains
four screws and four anchors) to attach vent
terminal Outside Wall Plate to exterior wall
and Inside Wall Plate to interior wall.

b. 100/150 mm Horizontal (Wall) Terminal, Part

Number 101809-01

Horizontal Concentric Vent Terminal, which
consists of Straight section having plain
male end with locking band clamp installed;
Terminal Assembly with offset vent
termination, and Outside Wall Plate, both
riveted on the opposite end); overall length
is approximately 31-1/8”.

Separate Inside Wall Plate.

Two Hardware Bags (each bag contains
four screws and four anchors) to attach vent
terminal Outside Wall Plate to exterior wall
and Inside Wall Plate to interior wall.

14. Installation of the Boiler Concentric Vent Collar is

covered in Section I above. See Figure 12.

15. For horizontal (side wall) installation, the Horizontal

(Wall) Terminal will extend past outer wall surface
either by 4-1/4” (80/125 mm), or, 5-1/2” (100/150
mm). See Figure 13 “Horizontal (Wall) Terminal
Installation”.

17. For horizontal venting, to install the Horizontal

(Wall) Terminal:

a. Cut a 5-1/2” diameter hole through the exterior

wall opening (for 80/125 mm concentric vent) or
6-1/2” diameter hole (for 100/150 mm concentric
vent) at the planned location of the horizontal
terminal.

Table 11: Concentric Vent Length

Boiler Model

Concentric Vent

Inner/Outer Pipe

Dia., mm

Vent Length

Wall Opening Diameter

Minimum

* Maximum

ALP080

Factory Supplied

Horizontal (Wall) Terminal

80/125 mm

21-7/8 in

Total of 60

Equivalent ft.

5-1/2 in

ALP105

ALP150

ALP210

ALP285

Factory Supplied

Horizontal (Wall) Terminal

100/150 mm

32 in

6-1/2 in

ALP399

note:

* With optional concentric vent components. See Table 10 for details.

This manual is related to the following products: