beautypg.com

Swiftech MCX V PRO User Manual

Page 3

background image

Copyright Swiftech 2006 – All rights reserved – Last revision date: 04-30-07
Rouchon Industries, Inc., dbA Swiftech – 3700 industry Avenue, Suite 104, Lakewood CA 90712 – Toll free (US) 888-857-9438–
Fax 562-595-8769 -E Mail: helpswiftech.com – URL:

http://www.swiftech.com

- Information subject to change without notice

Page - 3 -



2. Installation with Swiftech mounting system


Remove the motherboard from the chassis,

and remove the stock retention frames to
expose the mounting holes.

Install the standoffs though the holes, using

fiber washers and locknuts as shown in figure 2

Tighten the standoffs as shown figure 1, using

a ¼” socket tool to drive the standoff, and a
small pair of pliers to prevent the locknut from
spinning. Torque value should not to exceed 16
in. lbs. In other words just tight, without
excessive torque, otherwise the standoff stem
may snap.

Figure 3

Spring

Nylon Washer

6-32 x 1-1/4"

Standoff

Motherboard

Bracket


Tighten the sparing loaded screws in a crisscross pattern until the screws bottom out into the standoff. Once there, do not
attempt to lock the screws any further or they will jam out the standoff, and could prove difficult to remove if you ever need
to uninstall the heat sink. Installation is now complete.