beautypg.com

Initial start-up – Blodgett SB-G Series User Manual

Page 11

background image

OM-G-SB 9

Initial Start-Up

After the unit has been installed, test it to ensure that it is operating properly.

1. Remove literature and packing material from the interior and exterior of the unit.

2. Make certain the water supply is turned on.

3. Turn on electrical power to the unit.

4. Make sure the gas supply line is open, and turn on the gas valve.

Turn the knob on the gas valve to the “ON” position.

NOTE: The “trial for ignition” period is approximately 90 seconds after the on/off

switch is turned to the “ON” position. (Refer to the Control Panel illustration in

the Operation Section).

During initial start-up several trials may be necessary to remove air from the gas

piping. Subsequent start-ups should only need about five seconds for the pilot to

light. If the pilot burner does not light within the trial period, the ignition system

will automatically stop gas flow to the pilot burner, and terminate the ignition

trial. If this happens, turn the switch to “OFF” and then “ON” again, to repeat the

trial for ignition.

5. Turn the on/off switch on the cabinet front panel to the “ON” position:

• The amber light in the switch will come on

• The boiler drain valve will close

• The unit will fill with water

When the water level reaches the “mid” probe, the red RESET light will come on.

Push the start switch.

• The green light in the switch will come on

• The RESET light will go out

• The main burner will light

When the water level reaches the “hi” probe, the water supply to the boiler will

shut off.

6. After about 15 minutes, the pressure on the gauge will rise. When the pressure

reaches 9- 1/2 PSI, the main burner will turn off. Thereafter, as pressure

decreases, the burner will automatically re-light to maintain the 9-1/2 PSI level.

The pilot burner should stay lit, even though the main burner cycles on and off.

7. To shut the unit down, turn the on/off switch to OFF. When it has cooled to

approximately 130ºF, the boiler will automatically drain.

The pilot is off when the on/off switch is OFF.

If the boiler functions as described above, it is ready for use. If it does not, contact

your authorized Service Agent.

Operating Controls are located on

the front of the cabinet base unit.