Installation, Oven assembly – Blodgett BDO-100-G-ES User Manual
Page 8
6
Installation
oven Assembly
doUbLE sECTIoN AssEMbLY
1. Secure the short legs to the bottom sections as de-
scribed.
2. Place the upper section in position on top of the lower
oven.
3. Attach the stacking brackets using the remaining
5/16” bolts shipped with the ovens.
4. Attach the draft diverter to the bottom oven. DO NOT
install the draft diverter guard on the bottom oven.
5. Install the flue riser on the top oven. The bottom of
the flue riser slides down over the draft diverter on the
bottom oven. Secure with 12 screws.
6. Install the flue riser guard as shown below.
oVEN LEVELING
After assembly, the oven should be leveled and moved to
the operating location.
1. The oven can be leveled by adjusting the feet or cast-
ers located on the bottom of each leg.
Figure 5
Flue Riser Guard
Flue Riser
Flue Riser
Draft Diverter
Stacking
Brackets
- SG3240G (7 pages)
- MT3255G (2 pages)
- BCX-14G (60 pages)
- B36-RAD (24 pages)
- 1200 (3 pages)
- MT3240E/G (2 pages)
- SN-5G (20 pages)
- SC-7G (20 pages)
- 900 SERIES (22 pages)
- B48N-CCCC (2 pages)
- 1201 (2 pages)
- Conveyor Oven (3 pages)
- 966 (2 pages)
- COMBI B-142G (2 pages)
- AC-500 (15 pages)
- BE2136 (2 pages)
- BC-CCNE (2 pages)
- MT3870 (2 pages)
- KLT-12G (26 pages)
- KLT-12G (2 pages)
- ELECTRIC CONVEYOR OVEN MT1828E (2 pages)
- BG3240 (36 pages)
- R11021 (17 pages)
- RE-42 (2 pages)
- MT3855G (2 pages)
- COMBI COS-20G (2 pages)
- COS (2 pages)
- 1400 SERIES (18 pages)
- COMBI BC142EDS (2 pages)
- BG2136 (2 pages)
- 1415 (2 pages)
- 1415 (13 pages)
- ZEPHAIRE-E PLUS (2 pages)
- SHO-G (2 pages)
- S1820G (50 pages)
- MT2136E/G (2 pages)
- 1405 (2 pages)
- 1200 SERIES (16 pages)
- BCM (24 pages)
- BCT (47 pages)
- BC-20E (30 pages)
- BCP (52 pages)
- BDO-100-E (15 pages)
- DFG-100-ES (26 pages)
- Zephaire-100-G-Es (25 pages)