beautypg.com

Installation, Oven assembly – Blodgett BDO-100-G-ES User Manual

Page 8

background image

6

Installation

oven Assembly

doUbLE sECTIoN AssEMbLY
1. Secure the short legs to the bottom sections as de-

scribed.

2. Place the upper section in position on top of the lower

oven.

3. Attach the stacking brackets using the remaining

5/16” bolts shipped with the ovens.

4. Attach the draft diverter to the bottom oven. DO NOT

install the draft diverter guard on the bottom oven.

5. Install the flue riser on the top oven. The bottom of

the flue riser slides down over the draft diverter on the

bottom oven. Secure with 12 screws.

6. Install the flue riser guard as shown below.

oVEN LEVELING
After assembly, the oven should be leveled and moved to

the operating location.
1. The oven can be leveled by adjusting the feet or cast-

ers located on the bottom of each leg.

Figure 5

Flue Riser Guard

Flue Riser

Flue Riser

Draft Diverter

Stacking

Brackets