beautypg.com

Installation, Oven assembly – Blodgett SHO-100-G User Manual

Page 8

background image

6

Installation

Oven Assembly

DOUBLe SectiOn ASSeMBLY
1. Secure the short legs to the bottom sections as de-

scribed.

2. Place the upper section in position on top of the lower

oven.

3. Attach the stacking brackets using the remaining

5/16” bolts shipped with the ovens.

4. Attach the flue connector.

WARninG!!

When stacking ovens be sure to remove the

single oven flue boxes prior to attaching

three-piece connector.

Oven LeveLinG
After assembly, the oven should be leveled and moved to

the operating location.
1. The oven can be leveled by adjusting the feet or cast-

ers located on the botto

Flue Connector

Figure 6