8 system programming flow charts, System programming flow chart—how to use, System programming flow charts – Avaya PARTNER-18D User Manual
Page 93: System programming flow chart–how to use
System Programming Flow Chart–How to Use
8
System Programming Flow Charts
To use the following sets of Flow Charts, follow these instructions first:
Place the Programming Overlay on the dial pad of the system display phone at extension
10 or 11.
• To Start System Programming:
– Press
f 0 0
– Press
s s
• To End System Programming:
– Press
f 0 0
• To Use a Specific Procedure:
– Dial
#
and a three-digit procedure code.
(Example:
# 1 0 1
for System Date)
• To Cycle through System Programming Procedures:
– Press
N
or
P
• To Cycle Through Available Settings:
– Press
D
or
d
• To Return to Factory Setting:
– Press
r
Procedures # 207, #313, #314, and #315—shown in square dotted boxes—are for pools
Procedures #399, #609, and #728—shown in dashed boxes—are skipped when cycling
2.0
3.0
= Factory setting
= Button with lights required
= Button with lights recommended
= PARTNER ACS R. 2.0 or later
= PARTNER ACS R. 3.0 or later
✔
Icon Description