Checking the leds – Avaya PARTNER-18D User Manual
Page 25

2 Installing Your System
Installing the Control Unit
15
Quick Reference Guide
7
If this is the initial installation for a Release 3.0 system, follow these
additional steps:
a
Check the LEDs to make sure that the processor is on steady green for
at least 15 seconds.
b
Press
f00ss#989
at extension 10
or 11.
c
Press
25327
.
The system resets. You may proceed with the rest of the installation upon
completion of the reset (about 20 seconds).
Checking the LEDs
After you power up your system, check the green lights on the fronts of the
modules:
• If a single light is out, power down the control unit, reseat the module, and
then power up the carrier.
• If multiple lights are out, power down the carrier, reseat either both modules
(2-slot carrier) or the leftmost module that has a light out (5-slot carrier),
and then power up the carrier.
If the lights are still out, see the “Customer Support Document” on the
accompanying compact disc for information about whom you should contact.
If your system has a 1600 DSL module, initialization of the line
and extension ports may take up to 40 seconds. The
initialization of the 1600 DSL module itself may take from 2 to 7
minutes.