beautypg.com

Start-up procedure, Install infrastruxure rack-mount devices, Route and attach overhead wiring – APC InfraStruXure Power Supply User Manual

Page 6

background image

iv

InfraStruXure Site Planning, Installation, Start-Up

Ensure Total Power Off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Connect the Power Source to the PDU . . . . . . . . . . . . . . . . . . . 13

Access the PDU Main Input switch

. . . . . . . . . . . . . . . . . . . 13

Attach conduit to the PDU for the input conductors

. . . . . . . 13

Install a circuit breaker

. . . . . . . . . . . . . . . . . . . . . . . . . . . 15

Route the input conductors to the main input circuit switch

. 15

Torque specifications and tools required

. . . . . . . . . . . . . . . 15

Connect input conductors

. . . . . . . . . . . . . . . . . . . . . . . . 16

Connect User Contact Inputs and Output Relays to
the User Connection Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

Overview

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

How to connect contacts to the PDU Monitoring Unit

. . . . . . 18

Install Shielding Troughs, Shielding Partitions,
and Cable Ladders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Shielding Troughs and Shielding Partitions for overhead
wiring along rows

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Cable Ladders for overhead wiring across rows

. . . . . . . . . . 20

Install InfraStruXure Rack-Mount Devices . . . . . . . . . . . . . . . . . 21

Install the Rack Automatic Transfer Switches (ATS)

. . . . . . . . 21

Install the Rack Power Distribution Units (PDU)

. . . . . . . . . . 21

Install the InfraStruXure Manager and Hub (or Switch)

. . . . . 21

Install the APC Environmental Monitoring Unit

. . . . . . . . . . 21

Route and Attach Overhead Wiring . . . . . . . . . . . . . . . . . . . . . 22

Route and attach power cables to equipment racks

. . . . . . . 22

Wiring Under the Floor (Alternative) . . . . . . . . . . . . . . . . . . . . 25

Route Data Cables to the InfraStruXure
Manager Hub (or Switch) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

Connect network cables to InfraStruXure components

. . . . . 27

Route network cables to the InfraStruXure
Manager hub (or switch)

. . . . . . . . . . . . . . . . . . . . . . . . . 28

Start-Up Procedure ................................................ 29

Safety warnings

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Ensure that all power is off

. . . . . . . . . . . . . . . . . . . . . . . . 29

Apply power to the system

. . . . . . . . . . . . . . . . . . . . . . . . 30