Start-Up Procedure: InfraStruXure System

InfraStruXure Site Planning, Installation, Start-Up

31

6. Close (turn ON) the Main Output circuit breaker on the PDU.

7. Close (turn ON) the PDU distribution panel circuit breakers.

When the Main Output circuit breaker is closed, the power distribution

circuit breaker panels are energized.

When the distribution panel circuit breakers are closed, the PDU power

cables and connected equipment are energized.