beautypg.com

APC InfraStruXure Power Supply User Manual

Page 32

background image

Installation Procedures: Route and Attach Overhead Wiring

24

InfraStruXure Site Planning, Installation, Start-Up

5. From each NetShelter VX Enclosure, run the power cable of the appropriate APC power

management device out the roof of the enclosure, through the notch in the rear side of the

Shielding Trough, to the connector of the appropriate power cable from the PDU. Plug the two

connectors together, and twist them clockwise to lock.