Installation instructions, 8 install duct covers, 9 install filters – GE ZV800SJSS User Manual
Page 13: 10 finalize installation
8 INSTALL DUCT COVERS
Place the decorative duct
covers on top of the hood.
NOTE: The inside (upper)
duct piece has holes on one
end. The holes are intended
for use when the hood is
installed for recirculating
purposes. Slide the vented
end into the outer piece,
the vent holes should not
be visible in this installation.
The inside duct piece must slip into the folded ends
of the outer section.
Extend the inner duct upwards to the ceiling
bracket.
Secure duct cover to ceiling bracket with 2 screws.
Secure the lower duct cover to the hood by
installing 2 screws from the bottom of the hood
into the duct cover.
Mounting
screws
9 INSTALL FILTERS
Remove protective film on the filters.
Tip the filter into the slots at the rear of the
opening. Lift the filter lock and pull forward until
the filter rests in the slots.
Install both metal grease filters.
To remove the filters, press inwards on the handle
and pull the filter downwards.
10 FINALIZE INSTALLATION
Remove all packaging materials.
Refer to the Owner’s Manual for operating
instructions.
13
Installation Instructions
Filter Locks
:$//02817(',167$//$7,21³9(17('727+(2876,'(
NOTE: The charcoal filter is not required for this installation.
Install 2 screws,
duct cover and
into ceiling
bracket
Install
2 bottom
duct cover
screws