GAS BOILER SYSTEM COMMISSIONING CHECKLIST

CONTROLS

Tick the appropriate boxes

Time and Temperature Control to Heating

Room Thermostat and

Programmable

Load/Weather

Optimum

Start

Programmer/Timer

Room Thermostat

Compensation

Control

Time and Temperature Control to Hot Water

Cylinder Thermostat and Programmer/Timer

Combination

Boiler

Heating Zone Valves

Fitted

Not

Required

Hot Water Zone Valves

Fitted

Not

Required

Thermostatic Radiator Valves

Fitted

Not

Required

Automatic Bypass to System

Fitted

Not

Required

Boiler Interlock

Provided

ALL SYSTEMS

The system has been fl ushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions

Yes

What system cleaner was used?

What inhibitor was used?

Quantity

litres

CENTRAL HEATING MODE

Measure and Record:

Gas Rate

m

3

/hr OR

ft

3

/hr

Burner Operating Pressure (if applicable)

mbar

OR

Gas Inlet Pressure

mbar

Central Heating Flow Temperature

°C

Central Heating Return Temperature

°C

COMBINATION BOILERS ONLY

Is the installation in a hard water area (above 200ppm)?

Yes

No

If yes, has a water scale reducer been fi tted?

Yes

No

What type of scale reducer has been fi tted?

DOMESTIC HOT WATER MODE Measure and Record:

Gas Rate

m

3

/hr OR

ft

3

/hr

Burner Operating Pressure (at maximum rate)

mbar

OR

Gas Inlet Pressure (at maximum rate)

mbar

Cold Water Inlet Temperature

°C

Hot water has been checked at all outlets

Yes

Temperature

°C

Water Flow Rate

l/min

CONDENSING BOILERS ONLY

The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798

Yes

ALL INSTALLATIONS

If required by the manufacturer, record the following

CO

2

% OR CO

ppm OR CO/CO

2

Ratio

The heating and hot water system complies with the appropriate Building Regulations

Yes

The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions

Yes

The operation of the boiler and system controls have been demonstrated to and understood by the customer

Yes

The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer

Yes

*

All installations in England and Wales must be notifi ed to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.
A Building Regulations Compliance Certifi cate will then be issued to the customer.

©Heating and Hotwater Industry Council (HHIC)

www.centralheating.co.uk

Commissioning Engineer’s Signature

Customer’s Signature

(To confi rm satisfactory demonstration and receipt of manufacturer’s literature)

This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.

Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.

Customer Name

Telephone Number

Address

Boiler Make and Model

Boiler Serial Number

Commissioned by (print name)

CORGI ID Number

Company Name

Telephone Number

Company Address

Commissioning Date

To be completed by the customer on receipt of a Building Regulations Compliance Certifi cate

*

:

Building Regulations Notifi cation Number (if applicable)