commissioning

29

First ignition operation

1. Check the electrical supply.

Complete . . . . . .

Date . . . . . . . . . . . .
Installer . . . . . . . . . .

2. Check the type of gas and

change the gas if necessary.

Complete . . . . . .

3. Check the gas tightness.

Complete . . . . . .

5. Check the exhaust fl ue.
See page 18

Complete . . . . . .

6. Fill the installation.
See page 30

Complete . . . . . .

7. Check the hydraulic water

tightness.

Complete . . . . . .

8. Spin the pump.

Complete . . . . . .

9. Set the heating power.
See page 31

Complete . . . . . .

10. Set up heating controls

Complete . . . . . .

11. Balance the central heating

circuit.

Complete . . . . . .

12. Check the boiler in DHW mode
(combi only)

Complete . . . . . .

13. Adjust DHW fl ow rate on the

boiler (if necessary).

Complete . . . . . .

14. Analyse the combustion
(see page 33)
Complete . . . . . .

15. Check the ionisation current.

Complete . . . . . .

16. Explain to the end user the the
boiler operation.

Complete . . . . . .

17. At the time of commissioning, complete all relevant sections of the

Benchmark Checklist located on the inside back pages of this document.

Complete . . . . . .

6. Measure the gas inlet pressure.
standing + warming pressure

Complete . . . . . .