1 preparing for the installation, Preparing for the installation – Spectrex Xenon 700 SIL Open-Path Gas Detection System User Manual
Page 43
TM 799200 Rev (C), January 2014
Preparations for Installation
31
Two Tilt Mount Bases P/N 799640
1 base is used for the Detector
1 base is used for the Flash Source.
The Commissioning kit includes Function Check Filter and the Telescope
Kit, which is used during each SafEye installation and then removed.
They can be reused for all other SafEye installations on the site.
Therefore, only one set is provided for several detectors.
Telescope Kit P/N 799210
Function Check Filter P/N 792260 (1-5)*
Handheld Unit P/N 799810
* There are 5 options depending on full scale and type of calibrated gas.
5.3.1 Preparing for the Installation
The following procedure is used for preparing the installation of the 700S
Gas Detector:
1
Verify the appropriate Purchase Order. Record the Part No. and the
Serial No. of the detectors and source units and the installation date in
the appropriate log book.
2
Open the container package immediately prior to detector installation
and visually inspect the detectors; sources and accessories.
3
Verify that all components required for the detector installation are
readily available before commencing the installation. In the event that
the installation is not completed in a single session, secure and seal
detectors and conduits.
4
For wiring, use color-coded conductors or suitable wire markings or
labels. 12 to 20 AWG (0.5 mm² to 3.5 mm²) wires may be used for site
wiring. The selection of wire gauge should be based on the number of
detectors used on the same loop and the distance from the control unit,
in compliance with specifications (See Appendix A, page 53)