Ab c d, Step 8, Step 9 – Anthro eNook Pro for Flat Screen Assembly Instructions User Manual
Page 5
eNook
®
Pro Assembly Instructions
5
steP 8
install one toGGler™ for Drywall installation
¡
Drill 1/2” diameter hole in your wall at the mounting point.
¡
Insert a TOGGLER into a hole, metal end first.
¡
Pull the plastic ring end so the metal channel rests flush behind the
wall. With your other hand, slide the plastic cap along the straps
until the flange of the cap is flush with the wall.
¡
Place your thumb between the plastic straps. Push side to side,
snapping off the straps at the wall.
¡
Insert a 1-5/8" long screw into the TOGGLER, but don’t tighten all
the way. Leave the bolt head about 1/4” from the plastic cap.
steP 9
install remaining toGGlers
this is a two-person step!
¡
Lift the eNook Frame onto the bolt. Using a level to make sure that
the Frame is level, mark the second mounting point as shown. Be
sure that you mark your spot in the center of the small keyhole!
¡
Mark the third and fourth mounting points along the bottom hole
array. Set aside the Frame.
¡
Drill 1/2” diameter holes on the 2nd, 3rd, and
4th mounting points and install TOGGLERs as instructed above.
A
B
C
D
image: show the back panel of the 36w enook Pro on a wall
with the four mounting screws aligned and hovering.
ADD FAstener imAGe
1-5/8" screw
325-5086-00