Read me first – Maple Systems MAP460D User Manual
Page 3

INSTALLATION MANUAL
3
1010-0093, REV 03
Read Me First!
Your new Maple Systems OIT comes from the factory without any
communications protocol or operational software installed; therefore
•
The OIT will NOT operate until it has been configured using
MAPware-100 or STEPware-100.
•
When power is first applied, the OIT’s display will indicate that it
needs to be configured.
•
Use the MAPware-100 or STEPware-100 software to create a file
(or “project”) that can be downloaded to the OIT.
•
When the project is transferred, both communications protocol
and operational software are automatically loaded and the unit is
ready for operation.
To ensure that the OIT meets CE compliance, it is necessary to
follow all installation procedures described in this manual.