beautypg.com

Caution, Warning – Harrington Hoists and Cranes TCR Large Cap - (10-25 Ton) User Manual

Page 16

background image

16

3.10 Non-Stationary

Application

3.10.1 For applications such as rental fleets or construction sites where the hoist is moved from place-to-

place, a filter and lubricator are still required. Consult factory for recommended methods.

3.10.2 Connections and fittings must be kept clean and care taken to prevent dirt, debris and moisture from

entering the hoist.

3.10.3 Recommended practice for removing the hoist from an installation:

„

Run the hoist briefly with well lubricated air

„

Disconnect the air supply line

„

Inject a small quantity (approximately 20 drops) of oil into the hoist’s inlet port

„

Plug the inlet port

3.11 Preoperational

Checks and Trial Operation

3.11.1

CAUTION

Check for the availability of required operating air pressure of between 60 PSI to

90 PSI at the hoist's inlet port before trying to operate the hoist.

3.11.2

WARNING

Verify that the load chain is not twisted or tangled and that the bottom hook is not

capsized prior to operating the hoist. Correct all chain irregularities before conducting the first hoist
operation. See

Figures 3-5

and

3-6

.

Figure 3-5

Twist in Load Chain