beautypg.com

Operation, Rma test procedure, Initial test settings – Ransburg Test Stand RMA-303, EVOLVER, EVOLVER NE User Manual

Page 12

background image

LN-9259-07.1

1. Ensure that ground connections, cart ground,

and applicator ground are made to a true earth

ground.

OPERATION

W A R N I N G

> If true earth ground is not made, injury

to personnel or serious damage may occur

to the equipment.

> Ensure ALL items in the test area are

grounded. Ensure there are NO open

containers of flammable materials in the

test area.

> NEVER use solvent as a test fluid for this

device!

> Using any material OTHER than distilled

water or de-ionized water may cause fire

during the test. Use only distilled water or

de-ionized to test the applicator.

W A R N I N G

N O T E

> When opening dump valve for any test,

hold tubing securely by hand or clamp to

prevent whipping.

RMA TEST PROCEDURE

Setup

2. Provide air filtration to the manifold that has

the capability of passing 30 SCFM with particulate

removal of .3 to .6 micron particle size (bearing

air filtration is provided with the stand).

3. Provide a minimum 3/4-inch ID air line to the

filter at the manifold inlet. A minimum of 100 psig

pressure is required at the manifold inlet.

4. Install water supply line and air pressure line

to the pressure pot.

5. Fill the pressure pot liner with approximately

one (1) gallon of either de-ionized or distilled

water.

6. Plug the unit into a suitable 110/120V outlet.

INITIAL TEST SETTINGS

1. High voltage is off unless instructed to turn on.

Main power off.

Test Stations - Operation

9

N O T E

> Refer to the applicator service manual

for all parts and part number identifications.