4.3.1 Installing the Split-Core Current Sensor Assembly
Each phase being monitored will require one two-piece current sensor assembly.
Therefore, a three-phase meter will require three (3) assemblies. Open the two-piece
current sensor assembly by releasing the nylon clamp using a flat head screwdriver.
Fig. 4. Split-Core Current Sensor Assembly.
1. Reassemble the current sensor assembly around the conductor(s) to be moni-
tored. Ensure the current sensor halves marked “Load” are both facing the load
side of the conductor. The colored arrow will be on the source side of the con-
ductor being monitored and MUST be pointed in a clockwise direction around
the conductor being monitored. Tighten the nylon clamp to complete the assem-
bly.
Fig. 5. Arrow On The Current Sensor Assembly.
IMPORTANT:
When looking from the source side of the conductor(s) being monitored, you
should see the arrow on the current sensor assembly. The arrow should be
pointing in a clockwise direction around the conductor(s) being monitored. If
the arrow is not positioned on the source side, inaccurate readings will result.
M33213
LOAD
SOURCE
- E20-6001600J-D-KIT E20-600800-J-D-KIT E20-600400-J-D-KIT E20-600200-J-D-KIT E20-600100-J-D-KIT E20-6003200JKIT E20-6001600JKIT E20-600800-JKIT E20-600400-JKIT E20-600200-JKIT E20-600100-JKIT E20-4803200J-D-KIT E20-4801600J-D-KIT E20-480800-J-D-KIT E20-480400-J-D-KIT E20-480200-J-D-KIT E20-480100-J-D-KIT E20-4803200JKIT E20-4801600JKIT E20-480800-JKIT E20-480400-JKIT E20-480200-JKIT E20-480100-JKIT E20-2083200J-D-KIT E20-2081600J-D-KIT E20-208800-J-D-KIT E20-208400-J-D-KIT E20-208200-J-D-KIT E20-208100-J-D-KIT E20-2083200JKIT E20-2081600JKIT E20-208800-JKIT E20-208400-JKIT E20-208200-JKIT E20-208100-JKIT