Installation – Teledyne 5000B - Near Infrared Photometer User Manual

Page 19

background image

Part I: 2-1

Teledyne Analytical Instruments

Photometric Analyzer

Part I: Control Unit

Installation

Installation of Model 5000B Analyzers includes:

1. Unpacking, mounting, and interconnecting the Control/Analysis

Section

2. Making gas connections to the system

3. Making electrical connections to the system

4. Testing the system.

This chapter covers installation of the Control Section. (Installation of

the Analysis Section is covered in Part II of this manual.)

2.1

Unpacking the Control/Analysis Unit

The analyzer is shipped with all the materials you need to install and

prepare the system for operation. Carefully unpack the Control/Analysis
Unit and inspect it for damage. Immediately report any damage to the ship-
ping agent. Figure 2-2: Required Front Door Clearance

Allow clearance for the door to open in a 90-degree arc of radius 15.5

inches. See Figure 2-2.

Figure 2-2: Required Front Door

Clearance

2.2

Electrical Connections

Figure 2-3 shows the Control/Analysis Unit interface panel. Connec-

tions for power, communications, and both digital and analog signal outputs
are described in the following paragraphs. Wire size and maximum length
data appear in the Drawings at the back of this manual.