beautypg.com

Installation – Teledyne 3010TAC - Split architecture trace oxygen analyzer (EU - CENELEC) User Manual

Page 71

background image

Oxygen Analyzer

Part II: Analysis Unit

Part II: 3-1

Teledyne Analytical Instruments

Installation

Installation of the Model 3010TAC Analyzer includes:

1. Unpacking, mounting, and interconnecting the Control Unit and

the Analysis Unit

2. Making gas connections to the system

3. Making electrical connections to the system

4. Testing the system.

3.1

Unpacking the Analysis Unit

The analyzer is shipped with all materials needed to install and prepare

the system for operation. Carefully unpack the Analysis Unit and inspect it
for damage. Immediately report any damage to the shipping agent.

3.2

Mounting the Analysis Unit

The analyzer should be installed in an area that is sheltered from the

elements. In areas where the ambient temperature is expected to drop
below 0°C, auxiliary heating must be provided.

Install the probe with a suitable sample system in an area that is

protected from the elements and from possible RFI. The temperature
limits are the same as those specified for the sensor, but you can obtain
better accuracy if the temperature is held constant. The sample system
must be such as to provide a suitable flowrate of approximately 1000ml/
minute at a constant temperature. Also, the sample system should include
some means of introducing a span gas.

Three outline diagrams are included among the drawings at the rear of

this manual. The diagrams show the location and identification of the
electrical conduit connections, as well as the physical dimensions of the
separate units that comprise the analyzer.