Teledyne 3010PAC - Split architecture percent oxygen analyzer (EU - CENELEC) User Manual
Page 26
3 Installation
Model 3010
PAC
3-4: Part I
Teledyne Analytical Instruments
CAUTION: Use Shielded Cables. Also, use plugs that provide
excellent EMI/RFI protection. The plug case must
be connected to the cable shield, and it must be
tightly fastened to the analyzer with its fastening
screws. Ultimately, it is the installer who ensures
that the connections provide adequate EMI/RFI
sielding.
3.3.1
Primary Input Power
The universal power supply requires a 85–250 V ac, 47-63 Hz power
source. The power cord receptacle and fuse block are located in the same
assembly. Insert the female plug end of the power cord into the power cord
receptacle.
CAUTION: Power is applied to the instrument's circuitry as
long as the instrument is connected to the power
source. The
switch on the front panel is for
switching power on or off to the displays and
outputs only.
Fuse Installation: The fuse block, at the right of the power cord
receptacle, accepts US or European size fuses. A jumper replaces the fuse
in whichever fuse receptacle is not used. Fuses are not installed at the
factory. Be sure to install the proper fuse as part of installation. (See Fuse
Replacement in chapter 5, maintenance.)
3.3.2
50-Pin Equipment Interface Connector
Figure 3-4 shows the pin layout of the Equipment Interface connector.
The arrangement is shown as seen when the viewer faces the rear panel of
the analyzer. The pin numbers for each input/output function are given
where each function is described in the paragraphs below.
Figure 3-4: Equipment Interface Connector Pin Arrangement