beautypg.com

Maintenance, After all repairs and maintenance, Troubleshooting – Fulton Endura (EDR) Condensing Hydronic Boiler User Manual

Page 57

background image

Questions? Please Contact Your Local Manufacturer’s Representative

SECTION 4

EDR-IOM-2014-0318

MAINTENANCE

4-5

13. Reassemble in reverse order. Apply anti-seize to ignitor

screws prior to reassembly. Be sure to use new gaskets
for reassembly.

14. Ensure o-ring is positioned properly between premix

elbow and burner transition. Clean and apply o-ring
lubricant, as necessary.

15. Apply belleville washers so that they crown in middle; do

not use nuts or washers that are not provided by Fulton.

16. Apply anti-seize to burner fl ange studs and retorque to

23 ft-lbs.

17. Torque nuts under the premix elbow using a torque

adaptor at 90 degrees from the wrench handle.

18. Ensure door and all latches are closed when complete.

The louvers in the door provide cooling air to the
electrical panel. The door must be completely closed to
prevent unfi ltered air leaking into the cabinet.

After All Repairs and Maintenance

1. Follow “Pre-Start Check List” provided with the unit, and

all Safety Checks.

2. Fire the boiler and perform combustion check.

3. Make any necessary adjustments.

Troubleshooting

Use the following tables as a guide to troubleshooting your
boiler.