After the first cut more than 5-10 cm can be
fed. The possible cutting depth is dependent
upon the mount of reinforcement and the
aggregates in the concrete and the size and
specification of the blade.
The optimum cutting depth can be between
7 and 12 cm.
&XWWLQJ WKURXJK UHLQIRUFHPHQWV
For cuts following the length of the
reinforcement:
z
Prepare the cut so that the reinforcement is
completely cut through.
z
Do not plan the cut along the reinforcement.
The cut would otherwise drift.
,I WKH VDZ EODGH MDPV
z
Carefully withdraw from the cut with a
travelling or swivelling motion.
z
If this does not work: Disassemble saw
blade from wall saw head and remove saw
blade alone from the cut.
$W WKH HQG RI WKH FXW
z
Withdraw from the cut with the saw blade
running
z
Move swivel arm to the uppermost position
In sections where there are no reinforcing
rods do not use high power cutting, but
reduce this by about 40 bars.
If the blade touches any reinforcing rods,
the pressure will not then increase above
the maximum permitted level.
Always withdraw from a cut with the saw
blade running.