beautypg.com

Magnum Venus Plastech PUTTY UNIT User Manual

Page 28

background image

Putty Unit Operations Manual

Rev. 07/2012

Page | 28

5.

Turn Ram control lever to “up” position






Fig. 50






6.

Adjust pressure regulator marked Air Life to 20 psi

7.

Hold drum down if it beings to lift, close and open the ram control lever intermittently to raise
follower and pump out of drum.


8.

It may be necessary to adjust both Air Lift and Ram Extraction pressures accordingly to necessitate
removal with out lifting the drum.

9.

After pump and follower are removed, inspect, seal and dispose of protector boot

10.

Clean any build up of material on Piston Seals as well as follower plate

Note: The Standard Piston Seals (60520-3) for the Putty unit are Red Urethane. There is an
optional pair of Black (EPDM) Piston Seals (60520-1).

11.

Replace with “new” drum and refer back to procedures for priming new drum.