beautypg.com

Pre startup instructions – Magnum Venus Plastech PUTTY UNIT User Manual

Page 17

background image

Putty Unit Operations Manual

Rev. 07/2012

Page | 17


9. Attach ¼ inch air hose from regulator on manifold to flush tank or flush pump (see figures 5)

Fig. 5

10. Connect the Putty Hose

Fig. 9




Pre Startup Instructions:

1.

Check all hoses for wear or damage, replace if necessary.

2.

Check to be sure you have appropriate quantities of Putty material & Catalyst to complete the job.

3.

Check and repair or replace any damaged items before starting a job.

4.

Located on the Putty Ram unit check and adjust the Ram lower limit. By adjusting the APD-1011
bracket the RAM stop position can be adjusted (see “Adjust the Drum Low Level Limit” below).