beautypg.com

Changing empty drum – Magnum Venus Plastech PUTTY UNIT User Manual

Page 27

background image

Putty Unit Operations Manual

Rev. 07/2012

Page | 27

Changing Empty Drum:


1.

Position drum catch by sliding over base of drum rim (see Fig. 47)

Fig. 47

2.

Turn ram control lever to “neutral” position

Fig. 48

3.

Open the ball valve connected to the gauge and regulator marked Ram Extraction (see figure 49).


4.

Slowly turn up Ram Extraction regulator to 35 psi (see figure 49).






Fig. 49