beautypg.com

Changing the empty pain – Magnum Venus Plastech PATRIOT CHOP CHECK IMP-PAT-CCP-MP-5 User Manual

Page 28

background image

Patriot Putty Unit Operations Manual

Rev. 08/2012

Page | 28

Changing the Empty Pain:

1.

Turn Air Lift control lever to “neutral” position (see figure 21)






Fig. 21










2.

Open the ball valve connected to the gauge and regulator marked Ram Extraction (see figure 22).


3.

Slowly turn up Ram Extraction regulator to 25 psi (see figure 22).

Fig. 22


4.

Turn Air Lift control lever to “up” position (see figure 23).






Fig. 23