Patriot Putty Unit Operations Manual

Rev. 08/2012

Page | 24


8.

To lower barrel piston down into the pail, move the ram up/down handle to down position (see fig. 15).

Fig. 15


NOTE: Allow time for air to be pushed out of the air bleed off valve at the top of the barrel piston.

9.

Once barrel piston has come to a complete stop and a small amount of material starts to come out
the bleed off valve close the bleed off ball valve (see figure 14).


10.

Remove mixer assembly and mixer plug for the front of the gun if it has not already been removed.


11.

Position the gun over an appropriate waste container to allow priming of lines


12.

Pull and lock the gun trigger into the ON position.


13.

Slowly turn up pump pressure to 20 psi (1.2 bar) (see figure 16).

Fig. 16


14.

The Pump should begin to stroke, check for leaks on all hose connections. Material will flow to the gun.

15.

Secure leaks, if any.

16.

Allow Pump to continue pumping until there is a steady air free flow of material.

17.

Close the gun trigger.