6. Open main air feed ball valve and listen for air leaks. The ball valve has a safety relief port and air

will leak from the port until the valve is fully open or closed (see fig. 7).

7. Secure all fittings and correct air leaks if found.

8. Fill Flush Tank with appropriate cleaning agent at least 3/4 full.

9. Close the relief valve on the top of the Flush Tank.

10. Slowly turn up regulator pressure to Flush Tank to 50 -60 psi (3.5 – 4 bar) (see figure 10).

Fig. 10


11. Secure all solvent leaks.

12. Test flush system on gun block, by pressing the flush button, test both solvent and air purge (see fig. 11)





Fig. 11