beautypg.com

Magnum Venus Plastech Flex Molding Process IVX3 INJECTION VALVE 8010 User Manual

Page 31

background image

IVx3 Injection Valve Manual

Rev. 03/2012

Page | 31

Isolation Channel


Actuator Testing

– Fluid Section Fitted:


Follow the steps listed for testing the actuator with the fluid section removed, but when
testing for air leaks at the Bottom Bush (6983), apply soapy water to the Isolation Channel
shown in the image below.












Fluid Section Testing

– Vacuum Integrity:

1. Ensure the Resin inlet and Purge outlet hoses are exhausted and not connected to

any equipment.

2. Insert the Lower Valve Body (6986) nose into the universal insert on the top of the

IVX3 Service Module.

3. Connect the Inject output on the top of the Service Module to the Inject signal port

on the IVX3.

4. Connect the Purge output on the top of the Service Module to the Purge signal port

on the IVX3.

5. Ensure the valve is not actuated (no air supplied to either pilot) and the valve is in

the closed position.

6. Open the isolation valve on the Service Module and then adjust the vacuum level

at the universal insert to the maximum level (80% + vacuum). If this level cannot
be reached, do the following:

a. Check the test equipment by plugging the universal insert and ensuring a

high vacuum can be achieved.

b. Check the two O-rings (3265) on the IVX3 are in good condition.

If this is not the problem, the valve seal is leaking an unacceptable amount and the
valve fluid section should be serviced.