beautypg.com

Magnum Venus Plastech Flex Molding Process IVX3 INJECTION VALVE 8010 User Manual

Page 30

background image

IVx3 Injection Valve Manual

Rev. 03/2012

Page | 30

Actuator Testing

– Fluid section removed:

1. Connect the Purge output on the top of the Service Module to the purge signal port

on the IVX3.

2. Connect the Inject output on the top of the Service Module to the inject signal port

on the IVX3.

3. Operate the switch on the Service Module and put the valve in the Inject position.

Ensure the actuator shaft assembly moves freely through its full range of travel and
that the top of the shaft is visible in the upper slot of the Top Bush (6982).

4. Move the switch on the Service Module to the center to exhaust the air from the

Inject port. Ensure the IVX3 shaft assembly moves freely back to the un-actuated
position.

5. Operate the switch on the Service Module and put the valve in the Purge position.

Ensure the actuator shaft assembly moves freely through its full range of travel and
that the top of the shaft is visible only in the lower slot of the Top Bush (6982).

6. Move the switch on the Service Module to the center to exhaust the air from the

Inject port. Ensure the IVX3 shaft assembly moves freely back to the un-actuated
position.

7. Carry out steps 3-6 a number of times to ensure correct operation.

8. Put the IVX3 into the Purge position and then squirt some soapy water around the

Top Bush (6982) to check for air leaks.

9. Put the IVX3 into the Inject position and then squirt some soapy water around the

Bottom Bush (6983) to check for air leaks.

10. If there are any noticeable leaks, check for and remedy any of the following:

a. Bush is tightened and thread locker applied.
b. O-Ring is in good condition.
c. Bush is in good condition.
d. Actuator shaft is not damaged (scored etc.).