beautypg.com

Installation & set-up – Magnum Venus Plastech UltraMAX VLS-2400 Series User Manual

Page 19

background image

VLS-2400 Series Fluid Section Manual

Rev. 08/2013

Page | 19

Installation & Set-up:


1.

Check all clamp brackets, pump column, slave arm bracket, manifold clamp, etc. to make
sure they will not move when unit is in operation.


2.

Check the mounting of catalyst pump to make sure clevis pins are secure.


3.

Make sure exhaust silencer is secured to the power cylinder of the resin pump.


IMPORTANT: Snug up the packing nut at the top of the catalyst pump approximately ¼
turn.

4.

Snug up, tighten, the resin pump packing by inserting two rods into the holes in the oil cup
at the top of the resin pump fluid section. Turn clockwise until packing is snug. Note: Do
not over tighten.


5.

Pro Gun: Tighten the gun valve rod packing nuts until they are very snug. IMPORTANT:
Activate the gun trigger 10 - 15 times then tighten the packing nuts.
Repeat this
tightening procedure 3 times to make sure the gun valve rod packing is tight.


6.

Attach Suction Wand to Resin Pump.


a. Check all fittings on the wand assembly to make sure they are airtight.

b. Attach the wand assembly to the foot valve port of the resin pump.


7.

Hose connections.

a. Connect the black resin hose from the gun to the outlet fitting on the resin filter.

b. Connect the catalyst hose from the catalyst pump to the inlet of the catalyst manifold.

c. Connect the catalyst hose from the gun to the outlet of the catalyst manifold assembly.

d. Attach the red air hose from the gun to the fitting on the regulator labeled gun.

e. Attach the yellow poly flush hose from the gun to the outlet fitting of the solvent tank.

f. Attach the small red air supply hose from the flush regulator to the input fitting on the

solvent tank.

g. Attach the large red air hose from the pump regulator to the power cylinder of the resin

pump.

Note: Check all hose fittings and fluid connections to make sure they are tight.

h. Attach the ground wire from the gun to the electrical grounding lug on the pump

mounting bracket.

Note: Check electrical ground to ensure it is installed from the pump mounting bracket to
an earth ground.

i. Remove the catalyst poly tubes from the component box.