Magnum Venus Plastech PATRIOT 10:1 ADHESIVE SYSTEM User Manual
Page 25

Patriot 10:1 Adhesive System Operations Manual
Rev. 03/2014
Page | 25
14.
Slowly turn up pump pressure the Pump should begin to stroke, check for leaks on all hose
connections. Material will flow to the gun (see figure 20).
15.
Secure leaks, if any.
16.
Allow Pump to continue pumping until there is a steady air free flow of Adhesive and Activator.
17.
Close the gun trigger.
18.
Position outlet of the gun over a flush container
19.
Place the air purge / solvent selector to the air purge position then press the flush buttons, a sudden
purge of material from dispensing head is likely and could splash, so be cautious (see fig. 21)
20.
Allow air to flow for 3-4 seconds (see fig. 21)
21.
Place the air purge / solvent selector to the solvent position then press the flush buttons
22.
Press flush button to solvent purge for 3-4 seconds and again watch for splashing
23.
Repeat flush process several times as needed.
Solvent from the flush tank
Air Purge air supply
Flush/Air Purge Button
Air Purge / Solvent selector
Figure 21
Pump pressure regulator and gauge
Figure 20