Ram 300, Concrete pad construction, Installation specifications – Controlled Products Systems Group RAM300 User Manual
Page 8

RAM 300
RAMSET
6
www.ramsetinc.com
Gate Opened
CONdUIT FOR ELECTRIC POWER
CONdUIT FOR MASTER/SLAVE
CONdUIT FOR COMMUNICATION
Steel Square Tubing
4x4
STANDARD
INSTALLATIONS
Gates From: 8’-16’ (18”)
Gates From 16’-22’ (24”)
Inside
Property
Outside
Property
14”
2 1/2”
20”
6 3/4”
26”
13”
CONCRETE PAD CONSTRUCTION
Dimensions given for the pad are based
on soil bearing shear of 2000 P.S.F. These
figures may have to be adjusted
depending on local soil conditions.
1. Construct form for mounting pad
according to dimensions shown
in Figure 1 and 2.
2. Locate mounting pad according to
dimensions given in illustration.
3. Level top edge of form.
4. Set reinforcing bars and wire mesh.
5. Allow pad to cure for 48 hours,
and remove forms.
6. Note: conduits 6” above concrete pad.
INSTALLATION SPECIFICATIONS
Figure 1
18”
18”
25”
24”
Allow 2” above
ground level
minimum for
leveling.
ground Level
ground Level
DEDICATED CONDUIT
WITH 15 amp BREAKER
1/2” REDHEAD
ANCHOR BOLTS 4x
INDEPENDENT CONDUIT
FOR LOW VOLTAGE
WIRES
ELECTRICAL
CONDUIT FOR
MASTER/SLAVE
Figure 2