beautypg.com

Operator installation, Location of pivot point, Front view – Controlled Products Systems Group 1550ETL-1K User Manual

Page 7: Top view

background image

7

OPERATOR INSTALLATION

Location of Pivot Point.

1/2

Center Line of attachment
point for gate bracket

Hinge post

Vertical position of
pivot arm

Measurements are taken from the
center of the hinge.

Front View

Pivot Arm Must be level

Notes:
PULL TO OPEN
pulls gate open (actuator is extended when gate is in the closed position).
PUSH TO OPEN pushes the gate open (actuator is retracted when gate is in the closed position).
For PUSH TO OPEN installations see page 11.

If a 400 Upgrade Kit is to be used, refer to the 400 instructions for pivot point location.

The following instructions provide up to 105

o

of swing.

Gate (closed)

13”

6”

Direction of
opening

13”

6”

Left Hand Swing

Right Hand Swing

Top View

1.1 - PIVOT ARM INSTALLATION (standard pull to open)

Figure 1: Arm Installa on Top View

Figure 2: Arm Installa on Front View

This manual is related to the following products: