Fluid Components International FLT Series Rack Mount User Manual
Page 56
Doc. No. 06EN003250 Rev. N/C
2 - 3
FLT
Series FlexSwitch
Rack Mount
CHAPTER 2 - INSTALLATION
FLUID COMPONENTS INTL
Control Circuit Wiring
Mount the control circuit remotely by following the procedure below.
Warning:
Ensure that all power is OFF before wiring any circuit.
Wiring
The input/output connector for the control circuit is a 48 pin type F Eurocard connector, (DIN 41612). Shielded
cable must be used when running the cables to the sensing elements, as well as the signal voltage outputs if they are
used. Refer to Table 2-1 for the pin designations.
Table 2-1. Control Circuit Connector Pin-Outs
POWER SUPPLY PINS
P1-Z14
AGND
P1-D14
+24VDC
CH A RELAY PINS
ALARM 1
P1-D4
POLE
P1-B4
N.O.
P1-Z4
N.C.
ALARM 2
P1-D2
POLE
P1-B2
N.O.
P1-Z2
N.C.
CH A INPUT/OUTPUT PINS
P1-D12
OUT + A
P1-B12
OUT - A
P1-Z12
TEMP +A
P1-Z10
TEMP - A
P1-B14
SHIELD GND
P1-Z8
HTR + A
P1-B8
HRT RTN A
P1-D8
COM A
P1-D10
REF A
P1-B10
ACT A
P1-Z6
SHIELD GND
P1-D6
CHASSIS GND
CHANNEL A TEST CONNECTOR
P2-1
OUT +
P2-2
OUT -
P2-4
TEMP +
P2-8
TEMP -
P2-5
18V TEST POINT
P2-8
GND
CH B RELAY PINS
ALARM 1
P1-D32
POLE
P1-B32
N.O.
P1-Z32
N.C.
ALARM 2
P1-D30
POLE
P1-B30
N.O.
P1-Z30
N.C.
CH B INPUT/OUTPUT PINS
P1-D18
OUT + B
P1-B18
OUT - B
P1-Z18
TEMP +B
P1-Z16
TEMP - B
P1-B16
SHIELD GND
P1-Z22
HTR + B
P1-B22
HRT RTN B
P1-D22
COM B
P1-D20
REF B
P1-B20
ACT B
P1-Z20
SHIELD GND
P1-D28
CHASSIS GND
CHANNEL B TEST CONNECTOR
P2-6
OUT +
P2-7
OUT -
P2-9
TEMP +
P2-8
TEMP -
P2-10
18V TEST POINT
P2-8
GND
Remote Mounting
1.
Mount the control circuit rack to an appropriate and accessible surface. (See Figure 2-1.)
2.
FCI's recommendation is to install conduit between the local enclosure and the remote enclosure, as well as
installing conduit between the remote enclosure and the power source and monitoring circuit. Provide water
tight hardware and apply thread sealant to all connections to prevent water damage.