beautypg.com

Burkert Type 2100 User Manual

Page 4

background image

Installation wrench

Packing gland

Spindle guide

Spindle

Packing gland tube

Series production
status up to January
2013

Packing gland

Spindle guide

Spindle

Packing gland tube

Series production
status since January
2013

WARNING!

Risk of injury from parts jumping out!
When the spindle opening is exposed, the individual parts of the
packing gland are pressed out at an undefined speed when the
pilot air ports is pressurized.
• Before pressurizing with control air, safeguard the ambient area of

the discharge opening (e.g. place spindle on a firm base).

Control function A and I Pressurize pilot air port 1 with 6 – 8 bar.

Control function B Pressurize pilot air port 2 with 6 – 8 bar.

Grease the individual parts of the new packing gland with the
upplied lubricant.

Connect the individual parts to the spindle in the specified
direction and sequence.

Push packing gland into the packing gland tube.

Screw spindle guide back in using the installation tool. Observe
torque (see “Tab. 3”)!

english

Support ring
Upper chevron seals
Upper pressure ring

Pressure spring

Lower pressure ring

Lower chevron seals

Spindle guide

Insertion direction

for packing gland parts

Tightening torques of spindle

Spindle diameter

Tightening torque [Nm]

10 mm

6

14 mm

15

Tab. 3: Tightening torques of spindle

Installing swivel plate:

Connect swivel plate to the spindle.

Align bores of the swivel plate and spindle.

Support swivel plate on the cylindrical part with the aid of a prism
or something similar.

Insert pin into the bore.

Swage pin bores on both sides of the swivel plate using a chisel
or center punch.

Spindle

Pin

Swivel plate

english

Installing the actuator on the valve body:

Check the graphite seal and if required, replace it.

WARNING!

Danger if incorrect lubricants used!
Unsuitable lubricant may contaminate the medium. In oxygen appli-
cations there is a risk of an explosion!
• In specific applications, e.g. oxygen or analysis applications, use

appropriately authorised lubricants only.

Grease nipple thread before re-installing the actuator (e.g. with
Klüber paste UH1 96-402 from Klüber).

NOTE!

Damage to the seat seal or the seat contour!
• When installing the actuator, ensure that the valve is in open

position.

Control function A pressurize the pilot air port 1 with compressed
air (5 bar): valve opens.

Screw actuator into the valve body.
Observe tightening torque (see “Tab. 2”).

INSTALLATION TOOLS

Installation wrench for packing gland
(Only for removal of packing glands up to January 2013)
Installation wrench

Orifice

Order no.

Spindle ∅ 10 mm

15 - 40

665 700

Spindle ∅ 14 mm

32 - 65

665 701

Tab. 4: Installation wrench

SW

Modified socket wrench for packing gland
(Series production status since January 2013)
Socket wrench

Orifice

SW

Order no.

Spindle ∅ 10 mm

15 - 40

19

683 221

Spindle ∅ 14 mm

32 - 65

21

683 223

Tab. 5: Modified socket wrench

Special wrench for rotating the actuator
Order no.

665 702

Tab. 6: Special wrench

If you have any queries, please contact your Bürkert sales
office.

english

Type 2100