Pre startup check list (water-cooled) – ClimaCool UCW_H 30, 50, 70, 85 User Manual
Page 25

23
www.climacoolcorp.com
PreStartUp R-410A WaterCool 11.02.12
Project Name: _________________________________________________Date:___________________
Address: _____________________________________________________________________________
YES
NO
1.
Are modules connected properly per Codes and Installation Manual?
___
___
(Installation, Operation & Maintenance Manual is available at
www.climacoolcorp.com
)
2.
Is there a minimum of 60 mesh strainer on condenser and evaporator inlet water?
___
___
(Fill water to chiller being sure to pass through a minimum of 60 mesh strainer.)
3.
Is condenser water system filled and flushed? (See “Filling the Water System” in ClimaCool IO&M.)
___
___
4.
Is chilled water system filled, flushed and all air purged from system?
___
___
(Air must be purged from system prior to startup. See “Filling the Water System” in ClimaCool IO&M.)
5.
Are all pumps tested and operational?
___
___
6.
Are required GPM’s (verified by pressure differential) supplied to the chilled water side?
___
___
(See project specifications or selection and performance sheets available from ClimaCool Sales Rep.)
7.
Are required GPM’s/Pressure differential being supplied to the condenser?
___
___
(See project specifications or selection and performance sheets available from ClimaCool Sales Rep.)
8.
Pressure differential flow sensors or switches set to trip on the drop below required flows?
___
___
(Set to trip on low flow (less than 75% flow), not pump on/off.)
9.
Have all chiller coupling connections been leak tested?
___
___
10.
Is water presently circulating through chiller?
___
___
11.
Verified that temperature sensors and voltage/phase monitor have been installed?
___
___
12.
Verified power supply agrees with chiller nameplate?
___
___
13.
Is power and communication wiring complete to each module?
___
___
14.
Verify that wiring and devices meet with approved electrical submittal drawings?
___
___
15.
Is required load available to run multiple compressors at startup?
___
___
16.
Is control functional to maintain condenser water temperature?
___
___
(Includes maintaining “minimum” inlet temperature; see “Operational Limitations” in ClimaCool IO&M.)
17.
Is a water header bypass installed at the chiller? _________ ClimaCool provided? _________Field provided? (Check one)
If you checked “No” to any question above, provide the line reference number and the date of scheduled completion below.
Please note all conditions must be complete prior to the startup date.
_____________________________________________________________________________________________________________
_____________________________________________________________________________________________________________
*This form must be completed and submitted to ClimaCool Corp. a minimum of three (3) weeks prior to final scheduling of any
startup. Note: If any of the above items are not complete at time of startup, back charges will be assessed for additional costs.
Contractor Name: ___________________________
Address:
___________________________
_______________________________________________
___________________________
(Authorized Signature)
Phone:
___________________________
Date: _________________________________________