4gis – A.O. Smith BFC - 28 User Manual
Page 40

Filling and draining
40
Instruction Manual BFC
4
gis
Legend
a
pressure-reducing valve
(mandatory)
b
expansion vessel (mandatory)
c
T&P valve (mandatory)
d
stop valve (recommended)
e
non-return valve (mandatory)
f
circulation pump (optional)
g
drain valve
h
gas valve (mandatory)
i
stop valve (mandatory)
j
temperature gauge (optional)
k
condensation drainage
(mandatory)
l
hot water draw-off points
m
pressure relief valve
(mandatory)
n
water cistern
o
float valve
p
3-way venting valve
(recommended)
q
overflow pipe
a cold water supply
b hot water outlet
c circulation pipe
d gas supply
e flue gas discharge and air
supply
Figure 4.1 Installation diagrams
RE
SE
T
EN
TE
R
T
a
c
b
k
d
IMD-0139
m
UNVENTED
T
a
c
b
k
d
q
c
p
o
IMD-0138
VENTED
a
n