Carlon Multi-Gard Installation Procedures User Manual
Page 6
![background image](/manuals/321628/6/background.png)
MULTI-GARD
INSTALLATION PROCEDURES
www.carlonsales.com
be attached to the first section and assembled ahead of the trencher on the
ground directly above the intended place for the trench. As the trencher
advances forward, the Multi-Gard will lay itself into the trench behind. Once
placed in the trench, backfill according to the job specification.
Multi-Gard PVC Boring
is easy with the following installation procedures. These recommended
procedures have been tested by Carlon engineers for the easiest procedure with
the maximum holding strength.
Features:
o
Install one section at a time.
o
Easy field application.
o
Multi-Gard sections push together easily without tools.
o
Each joint can be connected as the Multi-Gard is being pulled.
o
Gasketed coupling body is water tight keeping out water and drilling
fluids.
o
Only tool required is a battery operated drill with 1/4" hex head bit.
Procedures for attaching to back reamer:
(After bore has been made according to the boring equipment manufacturer’s
recommendations.)
1.
Place mesh pulling grip over capped plain end. The first section is now
ready for pulling.
Gross Automation (877) 268-3700 · www.carlonsales.com · [email protected]