Carlon Multi-Gard Installation Procedures User Manual
Page 3
MULTI-GARD
INSTALLATION PROCEDURES
www.carlonsales.com
The
Multi-Gard belled end
may also be used as a terminator at entrances without
pre-cast terminators.
1. Insert the belled end flush with the inside wall of the vault with print line
facing upward.
2. Insert water tight plugs into unused cells.
3. Insert flared bell fitting to full depth.
4. Seal entrance as required by job specifications.
Use split plugs for sealing Multi-Gard cells where cable has been installed.
The
pass-through terminator
is designed to allow for continuous ducts through
the vault or hand hole for cable pulling.
1. Install terminator into vault following steps 1 through 5 for standard Type 1
terminator.
2. Cut innerduct of pass through kit 10" longer than the width of the manhole.
Add spacers as needed.
3. Upon completion, remove the watertight plugs and install innerducts to
traverse manhole/handhole by cutting to length inserting into one side of
handhole and raising or bowing center of innerduct span to insert into the
pass-through terminator on the opposite side.
Use the
jet terminator
for jetting operations.
1. Remove watertight plugs in order to assure to total insertion.
2. Apply standard grade solvent cement (VC9962) to male end of Multi-Gard.
Install jet terminator to insertion line.