2.2 Enclosure Installation, Steel or Concrete Pole
To mount the LPE on concrete or steel poles, two user-supplied mounting straps are required
(straps must be stainless, galvanized or equivalent). Most codes require the base of the
enclosure to be located a minimum height from the ground. Always verify height restrictions
before proceeding.
The majority of poles are the property of the local utility. Before installing an enclosure, the location and
method of mounting must be approved by the utility.
3. Securely fasten the enclosure to the bracket using the six
5/16" bolts, lock washers and fender washers (supplied).
Required Tools and Materials:
• Two user-supplied pole straps to fit pole (straps must be
stainless, galvanized, or equivalent)
• Ratchet with 1/2" socket
Installation Procedure:
1. Position the bracket so that the bottom of the bracket is
at least 6" off of the ground. Also make sure that the tab
is facing up. Secure it to the pole using the pole straps.
2. Hang the enclosure on the bracket.
Tab
ATTENTION: