Getting Started — Prepare the Enclosure

All installations:

By now you should be certain the retraction system has adequate under‑table clearance for installation and that proper legroom
has been provided to avoid accidental contact with the system. You should have the required accessories for mounting the
retraction system along with the necessary AAPs and AAP brackets to reconfigure the enclosure.

DANGER:

Severe Electrical Shock. Remove all
power from the Cable Cubby enclosure
before beginning a retraction system
installation.

Retrofit installations:

Prepare the AAP spaces ensuring sufficient under‑table
clearance for the retraction system.

Relocate, replace, or remove existing AAPs and
reconfigure associated AAP brackets to make room for
the system.

Getting Started — Prepare the Retractors

The retractors are delivered ready to mount vertically. No further modifications are required.
To mount the retractors horizontally or at an angle, remove the two enclosure screws (as shown below) before installation.

UNSWITCHED

100-240V/ 5AMAX

UNSWITCHED

USP HUB4 AAP

AC
TIVITY

100-240V/ 5AMAX

Check for adequate cable

clearance inside the

Cable Cubby enclosure.

Retractors take

two AAP spaces.

Filler modules
(part #

70-678-08)

take up the same
space as one retractor.

CC 800 shown

Cable Retraction System • Getting Started

Remove two enclosure screws
(front and back) from this position
for horizontal or angular mounting.

Install two enclosure screws
(front and back) in angular
mounting location.

1

2

3

Cable Stop Assembly

Enclosure

Move cable stop assembly
upward until the angular
mounting hole is visible.