Cable retraction system • setup guide (continued), Getting started — prepare the enclosure, Getting started — prepare the retractors – Extron Electronics Cable Retraction System Setup Guide User Manual
Page 4: All installations, Retrofit installations
4
Cable Retraction System • Setup Guide (Continued)
Getting Started — Prepare the Enclosure
All installations:
By now you should be certain the retraction system has adequate under‑table clearance for installation and that proper legroom
has been provided to avoid accidental contact with the system. You should have the required accessories for mounting the
retraction system along with the necessary AAPs and AAP brackets to reconfigure the enclosure.
DANGER:
Severe Electrical Shock. Remove all
power from the Cable Cubby enclosure
before beginning a retraction system
installation.
Retrofit installations:
•
Prepare the AAP spaces ensuring sufficient under‑table
clearance for the retraction system.
•
Relocate, replace, or remove existing AAPs and
reconfigure associated AAP brackets to make room for
the system.
Getting Started — Prepare the Retractors
The retractors are delivered ready to mount vertically. No further modifications are required.
To mount the retractors horizontally or at an angle, remove the two enclosure screws (as shown below) before installation.
UNSWITCHED
100-240V/ 5AMAX
UNSWITCHED
USP HUB4 AAP
AC
TIVITY
100-240V/ 5AMAX
Check for adequate cable
clearance inside the
Cable Cubby enclosure.
Retractors take
two AAP spaces.
Filler modules
(part #
70-678-08)
take up the same
space as one retractor.
CC 800 shown
Cable Retraction System • Getting Started
Remove two enclosure screws
(front and back) from this position
for horizontal or angular mounting.
Install two enclosure screws
(front and back) in angular
mounting location.
1
2
3
Cable Stop Assembly
Enclosure
Move cable stop assembly
upward until the angular
mounting hole is visible.