beautypg.com

Centripro, Residential water systems – Xylem BMAID R4 User Manual

Page 39

background image

PAGE 39

Residential Water Systems

CentriPro

VOLT

600-

500-

400-

300-

200-

100-

0-

3 phaSE StartEr VoltaGE ChECkout

Checking Voltage at fused Disconnect and

magnetic Starter

powEr IS oN during voltage

checking.

1. To check voltage: Use voltmeter on L1, L2 and L3 in

sequence. Check should be made at four locations.
Step 1 Checking incoming power supply.
Step 2 Checking fuses.
Step 3 Checking contact points
Step 4 Checking heaters.

2. When checking voltage, all other major electrical

appliances (that could be in use at the same time)
should be running.

3. If incoming power supply readings are not within

the limits (see chart), call your power supplier.

Voltage limits

Name plate

measured Volts

minimum maximum

208V 3Ø

188

228

230V 3Ø

207

253

460V 3Ø

414

506

575V 3Ø

518

632

NotE: Phase to phase – full line voltage. Phase to

neutral – ½ full line voltage. (depending on
transformer connection)

WARNING

VOLT

600-

500-

400-

300-

200-

100-

0-

RULE OF THUMB

Incoming power should be within 5% of power
supply voltage. Motors are rated ±10% of
nameplate. The other 5% is used for cable voltage
drop.