Safety, Mounting, Equipment inspection and storage – GE Industrial Solutions ZBTSD Series User Manual
Page 3: Final equipment inspection, Danger caution warning caution

71R
-4000B
1
■
ZBTS / ZBTSD Operation & Maintenance Manual
Safety
Each GE Zenith transfer switch is factory wired and
tested. A complete information package is furnished
with each switch which includes:
a.
Sequence of operation.
b.
Description and operation of
all accessories supplied.
c.
Power panel connection diagram
and schematic.
d.
Description and identification of
all customer field connections.
Installation of GE Zenith transfer switches includes:
a.
Mounting the transfer switch cabinet.
b.
Connection of Source 1, Source 2,
and Load cables or bus bars.
c.
Connection of external control
circuits as required.
Mounting
Adequate lifting means must be used to mount the transfer
switch into place. The recommended method for moving the
transfer switch using the lifting eyes, where supplied, and
a spreader bar is illustrated in Figure 1. Enough room should
be allowed to open the cabinet doors fully for inspection
and servicing of the switch per NEC and local codes.
The safe operation of your switch is
GE
Zenith’s focus. The
proper storage, installation, operation and maintenance
will help increase the life of the switch.
Equipment Inspection
and Storage
Once you have received the transfer switch, inspect it for
any damage. This includes damage to the enclosure, power
panel, control panel and wiring harness. If any damage is
found or suspected, file a claim as soon as possible with the
carrier and notify the nearest
GE
Zenith representative.
Before installation, if it is necessary, store the transfer
switch in a clean dry place, protected from dirt and water.
Provide ample air circulation and heat, if necessary, to
prevent condensation.
5% to 95%
(non-con-
densing)
-30°C to
+75°C
(-22°F to
+167°F)
40-400
AMP
(molded shell)
-20°C to +65°C
(-4°F to +149°F)
40-4000
AMP
(all other frame
and panel types)
-20°C to +60°C
(-4°F to +140°F)
Operating
Storage
Temperature
Temperature
(Ambient):
Humidity
Final Equipment Inspection
Prior to energizing the transfer switch:
1.
Remove any debris incurred, with a vacuum,
due to shipment or installation.
2.
Verify that all cabled connections are correct
and that phase rotation of both sources match.
3.
Check engine start connections.
4.
Verify the correct connection of all control wires.
5.
Check settings of all timers and adjust
as necessary.
6.
Adjust any optional accessories as required.
7.
Check the lug torque values of the power
connections.
NOTE
:
Lug torque values are specified
in table 2 on Pg 2.
8.
Make sure that all covers and barriers are
installed and properly fastened.
NOTE
:
Power panels ship from GE Zenith
in Source 1 Position.
HAZARDOUS VOLTAGE
(Can Cause Severe Injury or Death)
Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.
Due to hazardous voltage and current, GE Zenith
recommends that a GE Zenith Certified technician
or a qualified electrician must perform the
installation and maintenance of the switch.
Do not use a blower since debris may
become lodged in the electrical and
mechanical components and cause damage.
Before drilling conduit entry holes or any
accessory mounting holes, cover and protect
the switch and control panel to prevent dirt
and metal fragments from entering the
mechanical and electrical components.
Failure to do so may result in
damage and malfunction of the switch.
DANGER
CAUTION
WARNING
CAUTION