Grain Systems PNEG-365 User Manual
Page 30

Grain Systems, Inc. Assumption, Ill.
30
18' Manual Batch
DUMP CHUTE CHAIN ASSEMBLY
Attach all 18 dump chute chains directly to the lift plate as shown in diagram below.
Install all chains using "S" hooks (S-4692) to attach the chains to the dump chutes and lift plates. Keep excess chain
at the lift plate. Adjust the chains until the chutes are approximately level when the lift plate is in the closed (up)
position. Once the chains are uniformly adjusted, crimp the "S" hooks closed. Check when attaching the "s" hook to
the end link on a chain that the end has not been cut open. If this is found remove the end link or shift up and use the
next link in chain. The lift plate should be approximately 12" down from the cross channel when the chutes are level.
REV. 9-30-96
Figure #34
Chain leading to outer chutes
(82") Adjust length as required
TD-100205
Cable Clamp
S-4693
Loop in Cable
Chutes in closed position
Center Lift Plate
(TD-100801)
Crimp "S" hooks after
final chute adjustment
Center Collar
Cross Brace
Lift Plate
To sidewall pulley
assembly
12" when chutes are level(closed)