Dump hopper installation, Figure #24 floor sheet installation, Figure #25 – Grain Systems PNEG-365 User Manual
Page 23

23
Grain Systems, Inc. Assumption, Ill.
18' Manual Batch
TD-100647
Dump Hopper
Assembly
S-7221
5/16" x 3/4"
Self-Tapping Screws
TD-100654
Flashing Angle
Floor Sheet
TD-100767
REV. 9-30-96
DUMP HOPPER INSTALLATION
Pre-assemble the dump hoppers, and flashing angles to the floor sheets. Place a dump hopper under the floor sheet
and align it with the pre-punched large hole. Place a flashing angle on top of the sheet across the outer edge of the
hopper entrance with the angles interior angle facing the wide sheet end. Screw down through the angle, sheet, and
hopper with 5/16" x 3/4" self-tapping screws.
Figure #24
FLOOR SHEET INSTALLATION
Now the assembled sheets can be placed over the rafter framework. As the sheets are placed and overlapped they are
to be screwed down to the rafters using 5/16" x 3/4" self-tapping screws, leaving the second and sixth holes empty.
18' Floor Sheets
TD-100767
Figure #25
- PNEG-1890 (16 pages)
- PNEG-595 (26 pages)
- PNEG-1472 (30 pages)
- PNEG-897 (58 pages)
- PNEG-838 (4 pages)
- PNEG-1755 (36 pages)
- PNEG-524 (24 pages)
- PNEG-1080 (2 pages)
- PNEG-728 (47 pages)
- PNEG-673 (57 pages)
- PNEG-1717 (88 pages)
- PNEG-823 (42 pages)
- PNEG-630-6S (23 pages)
- PNEG-1876 (80 pages)
- PNEG-102 (2 pages)
- PNEG-366 (51 pages)
- PNEG-1626 (1 page)
- PNEG-1874 (78 pages)
- PNEG-1798 (34 pages)
- PNEG-1927 (4 pages)
- PNEG-924 (2 pages)
- PNEG-582 (26 pages)
- PNEG-012 (46 pages)
- PNEG-1797 (86 pages)
- PNEG-546 (26 pages)
- PNEG-951 (102 pages)
- PNEG-1650 (92 pages)
- PNEG-1649 (50 pages)
- PNEG-1376 (88 pages)
- PNEG-361 (46 pages)
- PNEG-338 (32 pages)
- PNEG-1276 (78 pages)
- PNEG-1283 (22 pages)
- PNEG-1089 (14 pages)
- QSG-001 (2 pages)
- PNEG-950 (96 pages)
- PNEG-1590 (3 pages)
- PNEG-501 (33 pages)
- PNEG-1447 (68 pages)
- PNEG-707GSI (446 pages)
- PNEG-349 (32 pages)
- PNEG-236 (22 pages)
- PNEG-743 (16 pages)
- PNEG-900 (54 pages)
- PNEG-1935 (92 pages)