Outer dump chutes, Figure #29, Flashing splice installation – Grain Systems PNEG-365 User Manual
Page 26

Grain Systems, Inc. Assumption, Ill.
26
18' Manual Batch
#10 Self-drilling Screws
(S-280)
TD-100648
Eave Flashing
(as viewed from inside the bin)
TD-100649
Eave Flashing
Splice
OUTER DUMP CHUTES
Bolt a TD-100598 angle dam to each dump chute using (3)1/4" x 5/8" bolts and nuts, as shown below. Use 1/4" x
5/8" bolts and double nuts to fasten dump chutes to hopper. Do not tighten first nut down. Lock second nut to first
nut and make sure chutes raise and lower FREELY!
TD-100647
Dump Hopper Assembly
S-1102
1/4" Nut (2 per bolt)
Lock together. Don't
tighten first nut down
S-1102
1/4" Nut (1 per bolt)
S-1429
1/4" x 5/8" Bolt
TD-100598
Angle Dam
TD-100017
Dump Chute
Figure #29
REV. 9-30-96
The flashing splice pieces can now be attached to the eave flashing to seal around the rib of the floor sheet as shown
with (S-280) #10 self-drilling screws. The flashing splice is a break apart piece. Attach the center piece in the center
so that it rests on top of the floor sheet rib. Break off the side pieces and place them such that they seal against the sides
of the ribs and attach each side piece with two screws. Make sure there are no gaps in the flashing.
FLASHING SPLICE INSTALLATION
Top Ring